HG Studio

Developing Design for Manufacturability (DFM) packages and technical documentation for new furniture lines every Expo Mueble Internacional season, as well as custom event furniture, with a constant focus on mass production and process optimization—engineering over 10 to 25 scalable designs per expo edition.

My Role

Senior Design Engineer, Prototyping Lead

Timeline

March 2024 - present

Tools

Solidworks, Illustrator, RDWorks, Excel, Word, Google.

Team

Developed by the Design and Manufacturing team in direct collaboration with the Production Manager and Factory Floor Leads.

DEVELOPMENT

Engineering Process

Are you ready to get launched into tomorrow?